En / 中文

KNOWLEDGE

Purification requirements for wall and floor of clean operating room

| 2023-01-30

1. Wall of operating department


(1) The walls of the operating room and the clean inner corridor are made of metal materials (electrolytic metal plate or color steel plate) that are rust-proof, scrub-resistant, acid-resistant, fireproof, sound-proof and heat-insulating, and the wall connection is in the form of circular arc.


(2) Color steel plate shall be used for the clean outer corridor and other auxiliary rooms, and the thickness of color steel plate shall be in accordance with the national standard.


2. Operating department floor


(1) All adopt antistatic, antibacterial, fireproof and wear-resistant pvc coiled materials.


(2) The seam of coiled material is welded by hot welding, flat and seamless, and connected with the wall by arc.


The above content comes from the network. For more needs of Tianjin Clean Operating Room, please consult: https://www.htswjh.com/

PREVNEXT

Tianjin Huatai Biological Engineering Purification Equipment Co., Ltd.

Tel:022-27461106/13902011192
Email:htswjh@163.com
Address:Tianjin Development Zone Bo run business square 1-1206
HOME / ABOUT / PRODUCT / CASE / NORM / KNOWLEDGE / MESSAGE / SERVICE
© Tianjin Huatai Biological Engineering Purification Equipment Co., Ltd. All rights reserved
https://www.htswjh.com/ 主营:

天津净化工程  天津净化车间  天津洁净实验室  天津洁净手术室  天津药厂净化